Brazil Ports and Industries Engineering

Cases

Results in high-complexity engineering

Projects delivered for refineries, pulp and paper plants, FPSO platforms, ports and heavy industry — in Brazil, South America, Europe and the United States.

Heat Exchanger — Petroperu Talara Refinery
Case 01

Heat Exchanger — Petroperu Talara Refinery

Scope
Stress analysis (ASME VIII, Divisão 2) e terremoto (norma peruana)
Result
5% reduction in initial weight
Client / Partner
MEESA (Áustria) & Haldor Topsoe (Áustria)
ANSYSApril/2019
Scrubber
Case 02

Scrubber

Scope
Stress analysis para o transiente térmico no revestimento
Result
5% reduction in initial weight
Client / Partner
MEESA (Áustria)
ANSYSApril/2019
Large-Diameter Piping — Galvani
Case 03

Large-Diameter Piping — Galvani

Scope
Stress analysis
Result
5% reduction in initial weight
Client / Partner
MJS (Osasco/SP)
ANSYSOctober/2020
Oxygen Reactor Head — Arian Methanol Plant
Case 04

Oxygen Reactor Head — Arian Methanol Plant

Scope
Design validation through stress analysis
Result
5% reduction in initial weight
Client / Partner
MEESA (Áustria)
ANSYSMay/2019
Flotation Tank Tray Fastening Bolts for WWTP — Guamaré
Case 05

Flotation Tank Tray Fastening Bolts for WWTP — Guamaré

Scope
Stress analysis para avaliação da integridade do equipamento após manutenção de rotina
Result
Validação da integridade e confirmação da vida útil remanescente (VUR)
Client / Partner
Veolia (São Paulo/SP)
ANSYSDecember/2019
Paper Production Digester
Case 06

Paper Production Digester

Scope
Calculation according to ASME VIII, Divisão 1, e terremoto conforme norma chilena
Result
5% reduction in initial weight
Client / Partner
Tequaly / Arauco (Chile)
PVELITENovember/2017
High-Pressure Heat Exchanger — FPSO MV30, Petrobras
Case 07

High-Pressure Heat Exchanger — FPSO MV30, Petrobras

Scope
Stress analysis para validação do projeto
Result
Final project documentation issued ahead of schedule
Client / Partner
Kelvion (Campo Limpo/SP)
ANSYSMarço/2019
Stress Analysis for Engineering Design Validation
Case 08

Stress Analysis for Engineering Design Validation

Scope
Structural design validation
Result
Project documentation issued ahead of schedule
Client / Partner
Cristófoli (Paraná/BR)
ANSYSJune/2020
Superheater — International Petrochemical Co
Case 09

Superheater — International Petrochemical Co

Scope
Stress analysis dos tubulões e da serpentina, incluindo içamento e transporte marítimo
Result
Revisão do projeto de içamento e transporte, garantindo a confiabilidade estrutural esperada
Client / Partner
MEESA (Áustria) & Innoweld Metalverarbeitung GmbH (Áustria)
ANSYSNovember/2020
Pressure Vessel
Case 10

Pressure Vessel

Scope
Calculation according to norma alemã AD-2000
Result
5% reduction in initial weight
Client / Partner
MCE (Alemanha)
Manual CalculationMay/2019
Evaporator Ducts, Effects 1 to 6 — WestRock Plant
Case 11

Evaporator Ducts, Effects 1 to 6 — WestRock Plant

Scope
Sizing and stress analysis
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
ANSYSNovember/2019
Chemical Reactor
Case 12

Chemical Reactor

Scope
Dimensionamento e validação do equipamento conforme ASME VIII, Divisão 1
Result
5% reduction in initial weight
Client / Partner
MCE (Alemanha)
PVELITEMay/2019
4th Effect of the Evaporation System
Case 13

4th Effect of the Evaporation System

Scope
Stress analysis para verificação de integridade estrutural em regiões com excesso de corrosão
Result
Structural integrity validated (Fitness for Service), com savings da ordem de milhões de reais
Client / Partner
Tequaly (Curitiba/PR)
ANSYSMay/2021
Reformer Furnace Outlet Piping
Case 14

Reformer Furnace Outlet Piping

Scope
System detailing
Result
5% reduction in initial weight
Client / Partner
MEESA (Áustria) & Innoweld Metalverarbeitung GmbH (Áustria)
Autodesk AutoCADNovember/2020
Chimney Fan (Usimec)
Case 15

Chimney Fan (Usimec)

Scope
Stress analysis e de fadiga
Result
Validação da vida útil remanescente (VUR), com savings expressivos
Client / Partner
LCI Ventiladores / Tequaly (Curitiba/PR)
ANSYSJune/2019
Rotary Cooler for CMOC International Niobium Calciner
Case 16

Rotary Cooler for CMOC International Niobium Calciner

Scope
Fatigue analysis
Result
Remaining useful life (RUL) determined
Client / Partner
MJS (Osasco/SP)
ANSYSJune/2020
Steam Turbine Condensers — Santa Cruz Power Plant
Case 17

Steam Turbine Condensers — Santa Cruz Power Plant

Scope
Hydraulic transient analysis para o sistema de captação e alimentação de água de resfriamento
Result
Geometry adapted to meet required standards
Client / Partner
Progen (São Paulo/SP)
PIPENETOctober/2019
Chimney (Klabin)
Case 18

Chimney (Klabin)

Scope
Calculation according to ASME STS
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
PVELITEMay/2019
Main Pipe Saddles — Santa Cruz Power Plant
Case 19

Main Pipe Saddles — Santa Cruz Power Plant

Scope
Stress analysis
Result
Geometry adapted to meet required standards
Client / Partner
Progen (São Paulo/SP)
ANSYSSeptember/2020
Economizer Duct System — Cenibra Biological Sludge Dryer
Case 20

Economizer Duct System — Cenibra Biological Sludge Dryer

Scope
Stress analysis
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
ANSYSSeptember/2019
Drift Separator (International Paper)
Case 21

Drift Separator (International Paper)

Scope
Stress analysis
Result
Adequação da estrutura na fase de projeto conceitual, com savings expressivos
Client / Partner
Tequaly (Curitiba/PR)
ANSYSMay/2019
Sludge Silo (Cenibra)
Case 22

Sludge Silo (Cenibra)

Scope
Structural sizing
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
PVELITEJune/2019
Damaged API-650 Tank
Case 23

Damaged API-650 Tank

Scope
Avaliação de integridade estrutural (Fitness-for-Service) por normas e por análise de tensões, com proposição de solução para retorno em operação
Result
Equipamento recuperado e operando a 98% da carga nominal
Client / Partner
Tequaly (Curitiba/PR)
ANSYS (levantamento da geometria por nuvem de pontos)August/2020
NGCD Condenser for Cenibra Oil-Fired Boiler
Case 24

NGCD Condenser for Cenibra Oil-Fired Boiler

Scope
Project sizing
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
ANSYSMay/2019
Blow-Tank — Reinforced Roof (International Paper)
Case 25

Blow-Tank — Reinforced Roof (International Paper)

Scope
Stress analysis
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
ANSYSOctober/2018
Quencher (Klabin)
Case 26

Quencher (Klabin)

Scope
Calculation according to ASME VIII, Divisão 1
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
PVELITEMay/2019
Reclaimer (Veracel)
Case 27

Reclaimer (Veracel)

Scope
Stress analysis e de fadiga
Result
Proposição de nova geometria para o sistema de contrapeso e para o rack, com savings expressivos
Client / Partner
Tequaly (Curitiba/PR)
ANSYSMay/2021
WestRock Digesters System
Case 28

WestRock Digesters System

Scope
Hydraulic transient analysis
Result
Revisão do projeto na fase de engenharia básica, proporcionando savings expressivos
Client / Partner
Tequaly (Curitiba/PR)
PIPENETJanuary/2020
Complete Gas Firing System for Bracell
Case 29

Complete Gas Firing System for Bracell

Scope
Stress analysis
Result
5% reduction in initial weight
Client / Partner
Tequaly (Curitiba/PR)
ANSYSMarço/2021
Ultrafértil Rotary Dryer
Case 30

Ultrafértil Rotary Dryer

Scope
Fatigue analysis
Result
Remaining useful life (RUL) determined
Client / Partner
MJS (Osasco/SP)
ANSYSMay/2021
ThyssenKrupp Nitrogen Vessel
Case 31

ThyssenKrupp Nitrogen Vessel

Scope
Calculation according to ASME VIII, Divisão 1
Result
5% reduction in initial weight
Client / Partner
MEESA (Áustria)
PVELITEApril/2019
Pile Detailing for Port Installation in the Netherlands
Case 32

Pile Detailing for Port Installation in the Netherlands

Scope
Detailing and sizing
Result
5% reduction in initial weight
Client / Partner
MCE (Alemanha)
Autodesk InventorMarço/2020
Sand Filter
Case 33

Sand Filter

Scope
Calculation according to ASME VIII, Divisão 1
Result
5% reduction in initial weight
Client / Partner
MCE / Primetal (Alemanha) — instalação na U.S. Steel (Pennsylvania/USA)
CodeCalcAugust/2020
Air-Cooler Structure — FPSO MV32, Modec
Case 34

Air-Cooler Structure — FPSO MV32, Modec

Scope
Stress analysis para validação da estrutura nas condições de operação e içamento
Result
5% reduction in initial weight
Client / Partner
Kelvion (Campo Limpo/SP)
SAP-2000May/2020
Fan Tie-Rod Analysis for Tunnel Installation
Case 35

Fan Tie-Rod Analysis for Tunnel Installation

Scope
Proposição e validação por análise de tensões de nova configuração do sistema de sustentação
Result
Antecipação do projeto final
Client / Partner
FAN-TR (Itu/SP)
ANSYSDecember/2019